Abertis announces that Autopista Central, a subsidiary of the holding group VíasChile has signed an agreement with the Chilean Ministry of Public Works (MOP) for the deployment of a major capex aimed at debottlenecking one of the most congested areas in the Northern part of Santiago de Chile. In more details the project relates to the construction of two one-way tunnels (1.5 Km each) connecting territories within the metropolitan area of Santiago de Chile (interchange between the General Velásquez stretch of Autopista Central and Américo Vespucio Norte portion of Santiago ring road). Total project costs are in excess of €300mn. The works are expected to be initiated in the first half of 2022 and be delivered within 40 months.
This project will allow Santiago to benefit from reduced pollution and road users to achieve fuel and travel times savings due to the improved traffic flow. The project includes 22 hectares of new public spaces for leisure, including over 6 hectares of re-greening.
Autopista Central, a concession that currently manages 62 Km in the North-South axle of Santiago de Chile metropolitan area until 2032, is the toll road with the largest traffic volume in the country and is one of the 6 concessions of Abertis’ portfolio in Chile. As part of this agreement, there will be an extension of 20 months for this concession.
In H1 2021, Abertis Chilean EBITDA stood at 174.000 euros, a significant portion of Abertis’ 1.6 billion euros H1 EBITDA. During 2021, Chilean motorways have seen a strong rebound in traffic showing since July a recovery of 2019 levels.
The transaction follows Abertis' strategy to prolong the average duration of its assets and reinforces its commitment to public-private partnerships with the objective to find long term value-creation and sustainability solutions for the territories in which it operates through agreements with the public administrations.
Download map and video: https://we.tl/t-GDoAxfNear
5 October 2026
• The agreement includes a €1.4 million contribution for a new three-year period, extending the joint project launched in 2017. The partnership has already benefited more than five million children and adolescents.
• This renewed partnership will focus its activities on two countries where the Foundation is present: Brazil and Mexico.
o In Brazil, the project will promote safe mobility by ensuring safe access to rights and essential services in vulnerable urban areas.o In Mexico, the STEM project will continue to promote science-related subjects among girls and adolescents throughout their educational journey.
Madrid, 5th October 2026.- The Abertis ...
22 September 2026
• The Group, together with its Foundation, has opened applications for the Safe Road Operations Challenge, a new open innovation call aimed at technology startups and SMEs from around the world.
• According to the Spanish Directorate-General for Traffic's National Registry of Traffic Accident Victims, 154 accidents related to road maintenance and conservation work were recorded on Spanish roads in 2025, with speed being the main risk factor.
• The challenge addresses a risk common to road operations worldwide: the direct interaction between road workers, live traffic and changing operating conditions.
• The winning proposal will receive a €40,000 ...